POWER GENERATION EXPERIENCE
Experience Built in the Field
The value of experience is whether it improves the next decision.
30+ Years
Power-generation experience
190
Gas turbine units built & commissioned
$65M-$500M+
Project scale
75-250+
Personnel led on major projects
30 & 45 Days
COD schedule pull-ins
International
United States, Mexico, Canada, South America, Russia, Europe, India, Middle East and Australia
Built and Commissioned: 190 Gas Turbine Units
14
LM2500s
115
LM6000s
20
LMS100s
21
Frame 5s
14
Frame 6s
6
Frame 7s
Additional Technology & Balance-of-Plant Experience
- Siemens and Solar turbine platforms
- RICE / reciprocating-engine generation
- Generator step-up transformers
- SCR and emissions systems
- Switchgear and electrical balance of plant
- Controls and plant integration
- Demineralized-water systems
- Interconnection equipment
- Gas and fuel systems
- BESS integration
- Commissioning interface
- Commissioning interfaces
The fleet count matters because every unit eventually becomes a field execution problem to solve.
MaCon positions experience as evidence, not decoration.
Arizona Electric Power Cooperative - Apache Generating Station
Robert Mackenroth managed construction of two LM6000
peaker units at Apache Generating Station, with
responsibilities extending through EPC execution, contractor
coordination, construction, commissioning, startup, and
commercial operation.
- LM6000 generation
- EPC execution oversight
- Contractor coordination
- Commissioning and startup
- Turnover and commercial operation
Someone needs to sit on the owner's side of the table.
Experience is most valuable when it protects the owner before a problem becomes expensive
Project Delivery in Demanding Environments
- Project execution planning
- Engineering and procurement coordination
- Construction management
- Major subcontractor coordination
- Project controls and reporting
- Schedule management
- Cost-to-complete awareness
- QA/QC coordination
- Owner-contractor interface management
- Risk and issue resolution
- Mechanical completion
- System turnove
- Commissioning planning
- Startup and performance testing
- Punch-list closure
- Final acceptance and closeout
Project Scale & Leadership
Schedule Recovery Requires Field Decisions
30 Days
COD pulled forward on one project
45 Days
COD pulled forward on another project
Closure
Focus on constraints, ownership & execution
What Recovery Leadership Looks Like
- Identify the actual critical constraints
- Separate schedule logic from field reality
- Assign accountable owners to open issues
- Prioritize work that changes the critical path
- Resolve contractor and OEM interfaces
- Escalate decisions before they become delays
- Track mechanical completion and turnover aggressively
- Align commissioning sequence with construction readiness
- Document changes and commitments
- Drive open items to closure
A schedule is only credible if the work, interfaces, decisions, and resources behind it are credible.
Commissioning Experience
- Commissioning planning
- Mechanical completion trackin
- System turnover strategy
- Pre-commissioning
- Startup sequencing
- OEM coordination
- Controls integration
- Electrical-system coordination
- Performance testing
- Reliability runs
- Documentation turnove
- Documentation turnover
- COD readiness
- Final acceptance and warranty implementation
FIELD REALITY
Problems that reach commissioning are usually expensive.
Experience That Changes the Quality of the Decision
- Generation-resource strategy
- Procurement decisions
- Project execution planning
- Technical-commercial evaluation •
- Technical-commercial evaluation
- Risk assessmen
- Capital and major-maintenance planning
- Owner-side project oversight
- Resource planning and committee advisory support
- Executive recommendations
- Board-level decision support
- Independent second opinions before capital commitment
Issues Experience Helps Find Early
- Undefined scope
- Unverified assumptions
- Missing interfaces
- Warranty language that shifts ris
- Equipment that does not fit the site
- Warranty language that shifts risk
- Commissioning requirements omitted from planning
- Change orders that are not documented
- Risks everyone sees but nobody owns
- Commercial terms that do not match the execution plan
Power Generation Career Foundation
- Sunland Construction
- PROENERGY
- GE FieldCore
- GE Granite
- BTEC Turbines
Define. Evaluate. Establish. Drive Closure
01
Define the Issue
02
Evaluate the Options
03
Establish the Path Forward
04
Drive Closure
PUT EXPERIENCE ON YOUR SIDE OF THE TABL
Before You Commit Capital, Get the Execution Question Answered.
If you are preparing to build, buy, commission, recover, or evaluate a power-generation project, MaCon can help define the issue,
evaluate the options, establish the path forward, and drive closure